RTM
Ventilation upgrade of the network's 19 underground stations
Goal : Improve the ventilation used for smoke extraction across the stations, maximising performance of the existing system while limiting works in the passenger area.
Scope : Performance-based approach applied site by site — numerical simulation verifying that simple adaptations could be proposed at each station. Extended support during works and up to acceptance testing (aeraulic and smoke extraction), with final tuning.
